Surfacing a Dependency Nobody Included in the Plan

The project plan is approved — but the key milestone depends on a vendor nobody accounted for. How to raise an overlooked dependency before it becomes a crisis.

C1 · Dialogue · 5 Min. · free

Editorially reviewed by James Simmonds – English teacher since 2004Published

SceneIn the planning review Jonas spots a gap: the October migration assumes an interface specification from the vendor — and it appears in no plan. He has to surface the dependency without becoming the bearer of bad news.
0:00 / 5 Min.

Tip: listen to the episode twice before you start the test. · Worksheet (PDF)

To the comprehension test
Jonas — Technical project lead, logistics ITRichard — Programme director

You may also like

Transcript

The full transcript opens after the comprehension test — so you train real listening instead of reading along.

Key phrases

dependency
something your work cannot proceed without
The plan hides a dependency on an external vendor.
to account for
to include something in your plan or calculation
The schedule doesn't account for the vendor's lead time.
to sign off
to formally approve something
The director signed off on the migration plan.
critical path
the chain of tasks that determines the project end date
The interface specification is on the critical path.
single point of failure
one element whose failure stops everything
One vendor holding the specification is a single point of failure.
to escalate
to raise an issue to a higher level of authority
We escalated the delivery date to the account director.
workaround
a temporary solution that avoids a blocking problem
The workaround lets us start mapping against the draft specification.
lead time
the time between starting a process and its completion
Starting early cuts the lead time roughly in half.

Language notes

In this episode a project lead halts sign-off because a milestone depends on a vendor specification nobody put in the plan. You learn the C1 pattern for surfacing overlooked dependencies — name the gap, quantify the impact, offer a package of solutions — and why "we become the specification" is a classic German error.

Speak before sign-off — and arrive with a plan

Jonas picks the most uncomfortable but best moment: right before Richard signs off ("Before you sign off …"). Crucially, he brings not just the problem but a package of three: visibility (a milestone with a named owner), commercial escalation (a contract date instead of a roadmap entry) and a workaround (the draft specification). Richard's reaction confirms the rule: "I assume you didn't raise this without a plan." Reporting a dependency without a proposal delivers a problem; bringing both is leadership.

The "bekommen" trap: become vs. get/receive

"Bekommen" and "become" sound related but mean different things: "to become" is "werden" ("She became head of department"), never "to obtain". Documents, replies and deliveries are things you "get" or "receive": "We receive the specification in September." The error is stubborn precisely because the sentence stays grammatically correct — only the meaning tips into the absurd: "We become the specification" = "We turn into the specification."

Making dependencies visible: the language of the critical path

The episode delivers the vocabulary international project teams use for risk: "on the critical path" (any delay moves the end date), "single point of failure" (one weak point everything hangs on), "lead time" and "to account for". Important for German teams: in English project culture "to escalate" is neutral to positive — a normal governance step, not a breach of trust with the vendor.

Keep practising: Learn business English online — with real teachers from Simmonds, since 2004.

Frequently asked questions

What language level is this episode for?

Level C1 (CEFR). The dialogue uses advanced project management English (critical path, single point of failure, escalation language); the vocabulary list explains all eight key phrases bilingually.

How do I raise an overlooked dependency in English?

With the three-step pattern from the episode: name the gap ("There's a dependency we haven't accounted for"), quantify the impact ("If they slip four weeks, go-live moves to December") and offer a package of solutions (milestone, escalation, workaround).

Why is "we become the specification" wrong?

"To become" means "werden" (to turn into), not "bekommen" (to get). The sentence literally says "we turn into the specification". Correct: "we receive the specification" or "we get the specification" — one of the most stubborn German-English traps.

Where can I practise this project language live?

In the online business English courses from Simmonds Language Services (englisch-lehrer.com/online): live lessons with real teachers on Zoom, for companies and individuals across Germany — with a free consultation first, since 2004.

Is there a transcript to read along?

Yes, the full transcript with German support notes is on this page — listen first, then take the test, then read along.

Want to practise these phrases in a real conversation?

The podcast trains your ear — in our online lessons you practise the conversation yourself, with real teachers. For companies across Germany since 2004.

Call